2.5 Year Neglected House Renovation | Timelapse

Transforming a rundown stone house. As a couple we demolish and rebuild three floors, knock through a thick structural wall, and tackle the damp issues.

Support Our Project:
Paypal:
Buy us a coffee:
…or become a channel member if you like!

Chapters:
00:00 – Clean-up & Prep for Drains
01:08 – Interior Drain
02:18 – Terrace Preparation
04:15 – Terrace Drain
05:18 – Demolishing The Top Floor
06:44 – The Roof
07:04 – Removing Remaining Plaster
08:18 – Terrace Base Layer
09:19 – Removing Joists
11:59 – First Floor Build
14:33 – More Demolition
15:28 – Top Floor Build
19:38 – Wall Knock Through
22:00 – Building The Doorway
23:35 – Creating a Stairway Landing
25:58 – Creating a Ground Floor Landing
30:15 – Landing Limecrete Floor Slab
31:24 – A Stove Plinth
32:07 – Ground Floor Limecrete Slab
33:47 – Thanks